Bulk Earthwork, RC Wall, Capping Beam & Anchor Beam and Slab Works – 2nr Tower blocks
Works included:
680m of diaphragm walling up to a depth of 35m
680m of continuous reinforced concrete capping beam
Installation of hydraulic props and associated waling beams
Excavation and removal of 75,000m3 of spoil inc. contaminated material
MAIN CONTRACTOR
Bachy Soletanche Piling Ltd
Project Value
£2,300,000