Bulk Earthwork, RC Wall, Capping Beam & Anchor Beam and Slab Works – 2nr Tower blocks

Works included:

  • 680m of diaphragm walling up to a depth of 35m
  • 680m of continuous reinforced concrete capping beam
  • Installation of hydraulic props and associated waling beams
  • Excavation and removal of 75,000m3 of spoil inc. contaminated material

  • MAIN CONTRACTOR Bachy Soletanche Piling Ltd
  • Project Value £2,300,000